المدة الزمنية 29:25

Bridge construction, track ballasting and some weathering

5 154 مشاهدة
0
292
تم نشره في 2021/06/19

In this video I construct the overhead bridge, ballast the track and fix the bridge into place for the lower level cutting. 0:00 Introduction 0:40 Planning the bridge form 2:53 Bridge construction 19:35 Track ballasting 24:20 Bridge and track weathering 28:15 Bridge in position 28:45 Conclusion Don Coffey /channel/UC8LH7xMAyCSqpClAvTHwJRw Wakefield to Knowsley via the Calder Valley /watch/wPH0RwMALl2A0 Music: Ambient, Electronic, Lounge Music – Electro Session by Alexander Blu https://orangefreesounds.com/ambient-electronic-lounge-music-electro-session/ Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) https://creativecommons.org/licenses/by-nc/4.0/ The Travelling Symphony by Savfk | /savfkmusic Music promoted by https://www.free-stock-music.com Attribution 4.0 International (CC BY 4.0) https://creativecommons.org/licenses/by/4.0/

الفئة

عرض المزيد

تعليقات - 51